Summary:
- VMs came up without having to do any configuration changes at all.
- VMs required only one engineer at a time to move all 185 servers
- VMs were MUCH cheaper to move
- Zero issues with VMware during this Data-Center Migration
- VMs make up nearly 30% of H&R Block's Windows server environment